CAPABILITY No.4

Hyperbaric
Tunnelling & Mining

Offshore-proven hyperbaric expertise, deployed underground. Specialist intervention personnel, mixed-gas systems and life support for TBM projects and mining operations.
OVERVIEW

When Compressed Air Isn't Enough.

Modern TBM projects are going deeper and facing higher pressures — beyond the limits where conventional compressed-air interventions remain safe. At those pressures, tunnelling becomes a hyperbaric discipline, demanding the same mixed-gas expertise, decompression management and medical oversight that governs saturation diving offshore.

That’s exactly where CTEK comes from. Our hyperbaric capability was proven in offshore diving operations, where the margin for error is zero. We bring that discipline — the personnel, the gas systems, the procedures — to the tunnel face and the mine.

“The physics of pressure doesn’t care whether you’re under the sea or under the city. The discipline is the same.”

WHAT WE DELIVER

Capability In Detail

01

Hyperbaric TBM Interventions

Trained intervention personnel and supervision for compressed-air and mixed-gas work at the TBM face — planned, managed and executed to hyperbaric standards.

02

Trimix & Mixed-Gas Systems

Gas supply systems for interventions beyond safe compressed-air limits — mixing, analysis, storage and delivery engineered for higher-pressure exposures.

03

Refuge Stations & Life Support

Sealed refuge chambers with independent life support for tunnelling and mining sites — engineered, supplied, commissioned and maintained.

04

TBM Lock Overhauls & Certification

Inspection, overhaul and recertification of TBM man locks and material locks — keeping pressure boundaries compliant and safe through the project lifecycle.

05

PVHO Shuttle Design & Build

Design and fabrication of pressurised transfer shuttles to ASME PVHO-1 — drawing on the group’s certified pressure vessel engineering capability.

06

Hyperbaric Medical & Emergency Response

Hyperbaric medical cover, fitness assessment and emergency response planning — the safety infrastructure behind every pressurised exposure.

FLAGSHIP PROJECT — DUBAI METRO BLUE LINE

On the Ground.
Underground.

CTEK is the appointed provider of Hyperbaric Tunnelling Services for the Dubai Metro Blue Line project — deploying this exact capability on one of the region’s most significant infrastructure builds.

RELATED EQUIPMENT

Equipment for This Capability

Select what your project needs and send an inquiry for a tailored quotation.

Screw Compressors Low-Pressure Air Compressor

Belt Drive Tank Mounted Series Low-Pressure Air Compressor

Direct Drive Series Low-Pressure Air Compressor

Double Stage Reciprocating Air Compressor Low-Pressure Air Compressor

EXPLORE MORE

Other Capabilities

01

Commercial Diving

02

ROV & Subsea Automation

03

HP Air Treatment & Compressor Systems

GET IN TOUCH

Planning Hyperbaric Work On Your Project?

Talk to our engineers early — intervention planning, gas systems and safety infrastructure are best designed in from the start, not bolted on later.